Tablet Press Bottom Band
Tablet Press Spacer

Minipress Single Station Tablet Press

The cost effective way to formulate…minimum size with maximum quality.

Designed for R & D...The Cost effective way shorten development time, solve formulation problems and produce low volume production runs. The Minipress is a 6-ton single station press that can fit on a lab bench.

The Minipress single station tablet press with "The Director" data acquisition and analysis system is designed for Pre-formulation and the early stages of development, when formulation is very limited, but the need for information is great. The purpose of the Minipress is to collect and analyze large amounts of data during the formation of a single tablet.

The system acquires upper and lower compression forces, ejection and radial die wall forces, and upper punch displacement. With these transducers and the SMI Director software program you can obtain work curves, Heckel and porosity plots as well as compaction profiles and strain rate studies.

Minipress Single Station Tablet Press
Number of Stations 1
Motor horse power 2
Maximum tablet diameter 24mm
Maximum tablet shape 25 x 10mm
Maximum compression force 6 Ton
Depth of fill 18 mm
Production Rate 6,000 TPH
Weight 160 kg
Instrumentation The Director

Options

  • Radial Die Wall Force transducer
  • Applied Force Transducer
  • Transmitted Force (Lower Compression Force Transducer)
  • Ejection Force Transducer
  • Displacement Transducer
  • Take-Off Force transducer
  • Nema 12X mobile Computer Enclosure
  • Stainless Steel Table with Heavy Duty Wheels
  • Tablet Deduster with Mobile Base
  • Director Instrumentation System (Includes software, digital signal processor, analog to digital converter)
The Minipress single station tablet press allows you to perform a complete analysis with as little as 1 gram of material.
Tablet Press Spacer
Home>> Products>> Tablet Presses>> Minipress Sitemap

Single Station Tablet Press designed for research and development (R&D),
shorten development time, solve formulation problems, and produce low volume production runs.